Western Tech Systems
Location
Size
Design Architect
This project delivers the new headquarters for Western Tech Systems along with refurbishment and storage functions, all supported by a structural system shaped by efficiency and sustainability goals. The narrow site results in short terminal bays, allowing the use of nonbearing Cross-Laminated Timber panels instead of conventional concrete walls. These CLT elements span to steel columns, reduce embodied carbon, and make a fully glazed entry elevation possible. A 3,500 square foot interior mezzanine adds flexible workspace within the warehouse volume.